Ordering Steel from China: A Buyer Checklist
Most disputes in overseas steel buying are born in the purchase order, not at the mill: an unnamed tolerance class, a certificate type left to chance, a packing clause nobody wrote. This neutral checklist covers the points worth fixing in writing before production starts.
1. Fix the specification completely
- Name the standard and its edition year (EN, ASTM, JIS, or the governing GB standard), the grade, and the delivery condition — as-rolled, normalized, quenched and tempered, annealed. Mechanical properties are only defined for a stated condition.
- Add the dimensional tolerance standard explicitly: for example EN 10029 tolerance classes for plate, EN 10060 for hot-rolled round bar. "Standard tolerance" without the document is not a specification.
- State sizes, piece weights, lengths, and the permitted quantity tolerance (overall and per size).
- Where a GB grade is offered against an EN or ASTM order grade, agree in writing which standard governs acceptance — equivalents overlap but are not identical.
2. Testing and certification
- Require EN 10204 type 3.1 inspection certificates as the default for traceable material; specify 3.2 at order stage if the project needs witnessed testing, because it cannot be added afterwards.
- Name additional tests explicitly, with method and acceptance values: ultrasonic class (e.g. EN 10160), Charpy test temperature and direction, intergranular corrosion practice for stainless, HIC testing for sour-service plate.
- Agree how results will be reported — actual measured values per heat, not "conforms" statements.
3. Inspection before shipment
Decide the inspection level and write it down: mill release only, document review, or third-party pre-shipment inspection (international inspection companies and the buyer's own agent both perform this). A useful scope covers quantity and bundle count, dimensional sampling, certificate-to-heat-number verification, marking checks and packing condition — with a written report and photographs.
4. Marking and traceability
Specify how heat identity travels with the steel: hard stamping on each piece where the application demands it, or stencil/tag per piece or bundle for surface-sensitive products. Require the packing list to reference heat numbers per bundle, so certificates can be matched to bundles on arrival without opening everything.
5. Packing and logistics
- Specify seaworthy packing in the order (see the packing guide on this site): wrapping type, corrosion protection, strapping, maximum bundle weight matched to the unloading equipment at destination.
- Wooden dunnage and skids must carry the ISPM 15 mark for most destinations.
- Fix the delivery term precisely — Incoterms 2020 with the named place (for example FOB Shanghai, or CIF with the destination port), and who arranges insurance and freight.
6. Commercial terms that prevent arguments
- Payment terms (T/T balance against documents, or letter of credit at sight) and the quotation validity period, since prices move with the market.
- Production and delivery lead time stated as a commitment, with what happens if it slips.
- The claims procedure: the period for reporting shortages or damage, the evidence required (photographs, survey report, test results), and how nonconforming material is handled.
The one-line summary
A complete order reads like a test plan: standard, condition, tolerances, certificate type, extra tests, marking, packing, inspection and claims — each named, none assumed. Almost everything on this list is free to add before signing and expensive to argue about afterwards.